To commission your E-Gen after receiving it from CranePower via land or sea freight, you must install the Manual Service Disconnect (MSD) fuse(s) and power test the unit. It’s important to review all steps before interacting with the unit in anyway, to ensure that your E-Gen is commissioned correctly.
Locate the provided MSD fuse(s):
On the connection side (rear) of the unit, press the E-Stop button to engage.

Remove the rear panel by inserting the key into the latches and unlocking, then depressing the latch buttons to release.
Keep a hold of the rear panel as it fully detaches from the chassis, pulling toward you to remove.
Identify the filter vent to gain access to the MSD fuse holders:
The E-Gen150 and E-Gen300 have a single filter vent.
For the E-Gen600, the MSD fuses can be accessed through the right filter vent.

Locate and loosen the four (4) Phillips-head screws securing the filter vent, then carefully lift out both the filter vent and the filter.
Install the MSD fuse(s) into the MSD fuse holder(s) on the Battery Management System (BMS):
Open the locking collar and insert the MSD fuse(s), then close the locking collar. Secure the locking collar by pushing in the red locking tab.

Reinstall the air filter and vent, securing the four (4) Phillips-head screws, and reattach the rear panel.
On the connection side (rear) of the unit, reset the E-Stop by turning the yellow ring clockwise until it stops and then release.
Connect a single-phase or three-phase input cable and turn on the supply.

On the control panel side (front) of the unit, open the front door panel by inserting the key into the latches and unlocking, then depressing the latch buttons to release.
Lift the front door panel to gain access to the front panel, which contains the control panel switch, control panel, and MCCB switch.

Turn the system power switch to ON (I). This will enable the battery chargers to begin operating and energise the internal DC bus with voltage from the charger outputs.

On the control panel, tap the Settings icon on the tool bar and input the following settings:
On the front panel, locate and remove the three (3) M5 Dome bolts on the left, then swing to open.

Check that each inverter module displays the power LEDs on and that there is no red fault LEDs illuminated.
Close the front panel and refasten with the three (3) M5 Dome bolts.